ENERGY PROJECTS
Translation by Götaverken Miljö AB
Same volume of fuel produces more
heat
After a few months of alignment
connected in between the bag filter
and the stack.
work, Karlstads Energi has now
The upgrade mainly consists of:
started a pilot operation of its new
- A two-stage scrubber, where the
flue
gas cleaning plant at
first stage cleans the flue gases.
Hedenverket.
- The water cleaning, which cleans
The entire project has gone very
the condensate before its emission.
well and should continue to do so
- The absorption heat pump, which
until we take over the plant, says
extracts extra energy for the district
Willy Krönström.
heating network.
And the result
- cleaner waste
These components ensure two
major advantages for the produc-
products and better utilisation of
tion of district heating in Karlstad.
the incinerated waste.
The first, and this is the main
reason why the conversion was
n January the expanded flue
carried out, is a reduction in the
gas cleaning plant was finally
emission of environmentally hazar-
I
connected to the number one
dous flue gases from the incine-
boiler at Hedenverket in Karlstad.
ration. This means lower emissions
The expansion of Hedenverket has meant the erection of a completely new building.
This is a waste boiler and the fuel
of hydrogen chloride and sulphur
comes mainly from the household
oxides, plus an increased separation
waste of several municipalities
of heavy metals. The timing was
Willy Krönström.
watt an hour there will now be 21
around Karlstad. At the present
well chosen and it will now be
to 22. This increase corresponds to
time the boiler produces 17 mega-
possible to meet, under controlled
Positive surprise
the consumption of about
700
watts of heat every hour for
conditions and by a good margin,
The condensation produces from 4
normal sized houses, without an
Karlstad’s district heating network.
the more stringent EU regulations
to 5 megawatts per hour. Karlstads
increase in the production costs.
that will be introduced in December
Energi expected to be able to
- We are extracting about
25
Major advantages
2005.
achieve 30 gigawatt hours a year,
percent more energy now, without
The flue gas cleaning in the boiler
But thanks to the new absorption
but during the alignment the ab-
having to put anything in, confirms
at Hedenverket has previously
heat pump, it will also be possible
sorption heat pump has proved to
a pleased Willy Krönström.
consisted of a reactor, bag filter and
to achieve a significant degree of
be a positive surprise and Willy
SNCR plant. The expansion
energy recovery.
Krönström now believes that the
Three stages
involves the erection of a comple-
- The results have surpassed our
figure will be
31 or 32 gigawatt
The adjustments to the new, more
tely new building to contain the
expectations, says an enthusiastic
hours a year. Instead of 17 mega-
severe EU requirements take place
new components, which have been
in three stages. The first was to
rebuild the waste boiler, which was
completed in the autumn of 2003.
The grating was replaced and the
boiler was extended to accommo-
date it.
It was also necessary to achieve a
temperature in the boiler of at least
850º C and to achieve this, in those
cases where the temperature cannot
be maintained only on the basis of
the incineration, a backup oil
burner was installed. These two
Götaverken Miljö AB’s ADIOX system,
tower packing material with carbon as
an extra dioxin barrier, integrated in the
Lifting the absorption heat pump, with the help of which it will be possible to extract extra energy for the district heating network.
scrubber system.
NORDISK ENERGI - 3/2004

ENERGY PROJECTS
- We expect to solve this soon, and
fi
nal stage in the upgrading of the
worse things have happened, says
number one boiler at Hedenverket.
Willy Krönström.
To check that the results comply
B Y H ENRIK A RBORÉN
with the EU requirements the
measuring equipment will be supp-
lemented, and this will be done in
the autumn of 2004, which is the
INFO
Hedenverket
oilers at Hedenverket.
There are two b
The number one boiler is a waste-fired
hot water boiler with an output of 17
megawatts per hour, in addition to
ts
which there are the new 4 megawat
per hour from the condensation. The
The absorption heat pump in place. The installation has surpassed the expectations of
number two boiler is a bio-fired CFB
Karlstads Energi.
boiler, which at full power produces 80
megawatts, with an attendant steam
turbine of 20 megawatts plus 20
measures now mean that the boiler
There were some minor deviations
megawatts condensation.
- The number one boiler inc
inerates
at Hedenverket complies with the
on the condensate to the recipient,
approx 7 tons of waste an hour,
requirements of the EU directive
but these will be put to rights by the
corresponding to 50 000 tons a y
ear,
for retention time and incineration
supplier of the absorption heat
which mainly consists of municipal
temperature.
pump.
household refuse.
The second stage is the one that is
- The cost for the co
nversion of the
in the process of being completed
Minor problem
number one boiler was higher than the
just now, i.e. the expansion of the
After the alignments in the spring it
expected 40 million kronor, and is now
flue gas cleaning and installation of
was time in the middle of April to
expected to rise to the order of 45
million. The reason for this is that it
was
an absorption heat pump. The
start the six week pilot operation.
decided to supplement the boiler with
alignment began straight away in
But there was just one minor
equipment to boost the heating of the
January and continued to the midd-
problem, crystallisation in the salt
boiler on start-up.
Willy Krönström, project leader at
le of April. And the preliminary
solution in the absorption heat
Karlstads Energi.
performance tests looked good,
pump
- which is now being
according to Willy Krönström.
investigated.
Absorption heat pumps and
absorption chillers
for dioxin removal
Götaverken Miljö has recieved an assignment to upgrade the flue gas
cleaning system in the waste incineration plant at Karlstads Energi.
he plant will include highly efficient energy recovery with flue gas
T
condensation and absorption heat pump including a scrubber system with
ADIOX to eliminate the risk of the ”memory effect” and to function as
”police filter” for dioxin.
ADIOX is at present integrated in scrubber sys-
tems at six waste incineration plants. The first of
which has been in operation since September
2001.
- Dioxin is efficiently absorbed
xisting scrubbers
- ADIOX can be integrated in e
- Static, operationally reliable system.
tion and adsorption of dioxin in
Absorp
ADIOX
Address: Anders Carlssons gata 14, Box 8876, 402 72 Göteborg
Telephone: 031-50 19 60 Telefax: 031-22 98 67
www.gmab.se
NORDISK ENERGI - 3/2004